This report has been performed at Anders Krahner AB in Skillingaryd which is a part of Proton Group AB. Year 2005 Proton Group had a turnover of 920 smkr with 730 employees while Anders Krahners turnover was 160 smkr with 90 employees. Anders Krahners customers are mostly within the automobile industry.The aim of this report is to study the possibility to optimize the production flow for two articles in the existing premises. By studying the factors that have a negative impact on the throughput time give proposal of how this can overcome. The question is if this can be done in existing premises or if a new premise is required. The study has been made from raw material stock until the delivery of the end product to the customer.All the facts have been required from Anders Krahners MPS system and are based on one year’s basis. The average time for the processes and the stock has been calculated from this data. The planed times for the operations has also been collected from their MPS system. To gain an understanding for the production a layout flowchart has been made. Throughout analysis of these the total internal transport stretch has been calculated.It is shown in the result that the planed operation times equal the actual operation times quite well. This interpret that the operations works well out of a time perspective, but there is a lack of quality at the products. A thing that influences the throughput time negative is the time for raw material- and middle material stock. More reasons to the complex internal transport today are the lack of nearness between operations. A part of the operations that are made in the process in completing the articles are made external. These operations create some of the complicated internal logistics.To create the wanted nearness between the operations new layouts have been created in the existing premises. Some of the operations that are made external before have been suggested to be made in house. Due to this a greater control over the entire flow is received and higher product quality. The main difference between the suggested layout in the existing premises and a new one is considered to be small.
Bibliographical Information:

Advisor:

School:Högskolan i Jönköping

School Location:Sweden

Source Type:Master's Thesis

Keywords:throughput time process mapping production layout flow analysis internal logistic stock

ISBN:

Date of Publication:06/14/2006

© 2009 OpenThesis.org. All Rights Reserved.