Details

Utredning Tärnsjö Garveri

by Eriksson, Kim

Abstract (Summary)
Tärnsjö tannery have under a longer time been planning to move some of the concrete pillars intheir building, at the same time the conditions to broaden an existing gateway and make abuilding plan for a corroded roof is investigated. Current construction plans can´t be found andthat severely complicates the work.Moving the pillars will result in higher stress on the current beam and measures have to be takento retain the buildings stability. An iron beam or reinforcement with carbonfibre will manage thestress. The gateway can easily be widened if an ironbeam is laid as reinforcement at the top of thegate. And parts of the lower windows need to be cast shut. Because of the missing constructionplans the beam over the gate is projected to carry all of the loads in the wall, including the weightof the joists. The reason why the ceiling in the warehouse has begun corroding depends to big parton the tarpaper that should protect the ceiling from damp, it´s old and needs to be changed. Theceiling has become an outdoor room which means increased tear on the current tarpaper. To solvethis problem the ceiling needs to be cleaned and the paper replaced.
Bibliographical Information:

Advisor:

School:Högskolan i Gävle

School Location:Sweden

Source Type:Master's Thesis

Keywords:

ISBN:

Date of Publication:11/06/2008

© 2009 OpenThesis.org. All Rights Reserved.