Prefabricerade hus - en fråga om kvalitet, ekonomi och byggtid

by Elwing, Charlotta; Sjögren, Kristin

Abstract (Summary)
The main purpose with this diplomawork is to compare the two production methods,premanufacturing and on-site construction. We want to investigate if one of the methods is more advantageous than the other and why premanufactured elements are used more often. The comparisons mostly consider aspects of building time, economy and quality. We gathered the material we needed through a literature study and by interviewing active persons in the building industry.Building as much as possible in a production hall increases the quality since it’s not being exposed to moisture and cold before assembly. The house is built much faster when the building site becomes a montage place with different finished elements. There is no material storage at the building site since the elements are delivered when it’s time to assemble the specific element. If the elements are delivered when needed, building time will decrease which means reduced costs for the whole project.
Bibliographical Information:

Advisor:

School:Växjö universitet

School Location:Sweden

Source Type:Master's Thesis

Keywords:

ISBN:

Date of Publication:10/27/2006

© 2009 OpenThesis.org. All Rights Reserved.