Details

Ledtidsreducering vid Saab Training Systems Ab : Lead time reduction at Saab Training Systems AB

by Avdic, Aldin; Kling, Johan

Abstract (Summary)
Abstract This thesis has been carried out at Saab Training Systems AB in Huskvarna. Saab Training Systems develops manufactures and sell complete military training concept. The purpose of this report has been to reduce the lead-time, when a short delivery time has becoming an important competitive strength. The assignment involved a survey of the present spare part and repair flow, identifies problems and finds improvement proposals. Further we have studied the spare part inventory levels and its tied capital. The project was performed by interviews with concerned personnel, observations, surveys and studies of statistics. We have also worked with Supply Chain Operations Reference Model which is an open reference model, whit it’s help you can identify, change and optimize your organization. Saab Training Systems objective is that the lead time for the spare part and repair flow should be 14 days but in the present the case is otherwise. The lead times are today much longer but the company doesn’t know how long. These long lead times mainly depends on that it occurs a lot of passive time in the spare part and repair flow. This time comes up while waiting at transport but also as a consequence of that the company at the moment has a lot to do. To achieve a reduction of the lead-time Saab Training Systems ought to reduce the passive time. Saab Training Systems should reduce their inventory level to liberate tied capital. In this way they will reduce the risk that the products lose value.
Bibliographical Information:

Advisor:

School:Högskolan i Jönköping

School Location:Sweden

Source Type:Master's Thesis

Keywords:

ISBN:

Date of Publication:11/16/2007

© 2009 OpenThesis.org. All Rights Reserved.