Development of a Five-Axis Machining Algorithm in Flat End Mill Roughing Development of a Five-Axis Machining Algorithm in Flat End Mill Roughing
Consider the machining of a mold or die. The complex nature of a mold requires at least 20-30 weeks of lead time. Of those 20-30 weeks 50% is spent in machining. Of that time 50-65% is spent in rough machining. For a mold or die that amounts to 7 to 8 weeks of rough machining. If one could achieve as much as a 10-15% reduction in machining time that would amount to almost one week worth of time savings. As can be seen, small improvements in time and efficiency for rough machining can yield significant results [Fallbohmer 1996].
This research developed an algorithm that focused on reducing the overall machining time for parts and surfaces. Particularly, the focus of this research was within rough machining. The algorithm incorporated principles of three-axis rough cutting with five-axis CM2, hence Rough Curvature Matched Machining (RCM2). In doing so, the algorithm ‘morphed’ planar machining slices to the semi-roughed surface allowing the finish pass to be complete in one pass. This roughing algorithm has significant time-savings over current roughing techniques.
Advisor:
School:Brigham Young University
School Location:USA - Utah
Source Type:Master's Thesis
Keywords:curvature matched machining rough five axis flat end mill cnc
ISBN:
Date of Publication:04/04/2005